Thursday, 11 November 2010

ENGINEER'S NOTES


This is a copy of the tension piling layout that we managed to obtain from the engineering firm, Anthony Hunt Associates, that designed and built the bridge along with Future Systems. The details on this show the specific locations of the piles along with other structural calculations and drawings.


No comments:

Post a Comment